Pending the addition of closures the slops for my brother's Robert Sidney 2.0 are completed!
Sidney 2.0 vs 1.0
The next step will be to do a fitting before add closures and then I'll do a second mock-up fitting of the doublet before I'll start constructing the doublet.
Between waiting for fittings and working on other commissioned pieces, I'm starting work on my next dress. A separate post detailing the plans and fabrics for that project will be forthcoming.
In the meantime: here are some more gratuitous photos of pitbulls!
These were all taken on the morning of the Snowmageddon here in Milwaukee. Kimora was plunging into the biggest drifts she could find; Chewi was less impressed.
Well, until next time!
Tuesday, February 8, 2011
Tuesday, February 1, 2011
New Project: Sidney 2.0
And so the next project begins!
Allow me to introduce Robert Sidney 2.0. We may all remember the outfit I made for my brother playing Sir Robert Sidney at the Bristol Renaissance Faire http://theradclyffe.blogspot.com/2010/11/sir-robert-sidney.html In case we don't, there's the link. As that was my first shot at Elizabethan menswear, some things didn't turn out quite as I'd have liked, and other things just didn't really survive the season. So I will be remaking some of this outfit, namely the doublet and slops.
The cape and sleeves, as pictured below, will be retained.
New fabrics and trim have been bought for the doublet and slops to match the existing color scheme, but create a completely new look:
Materials came from a number of different stores, including Loomcraft in Vernon Hills, Il, Vogue fabrics in Evanston, Il, Fishman's Fabrics in Chicago, Il, and Gayfeather Fabrics in Madison, WI.
I've been able to make a start and some good progress on the slops already. The slops are cut out and wefted (the material was just a tad too lightweight) and ready to be assembled. And excitingly, the better part of the night was spent cutting and constructing the panes, which are now finished!
Here you can see how I first flatlined the layers together, then used the copper Burmese Silk Blend to bind the edges, then couched a blue rattail in the ditch to give them that extra pop!
A couple panes together:
Laid out over the slops fabric:
And a close up of the finished panes fanning out on the slops fabric:
If I get called off of work tomorrow thanks to the Snomageddon, I'll continue putting the slops together tomorrow. Otherwise I'll get back to them sometime soon. Until then, enjoy these photos and your SnowDay if you are so lucky, and thanks for checking in!
Allow me to introduce Robert Sidney 2.0. We may all remember the outfit I made for my brother playing Sir Robert Sidney at the Bristol Renaissance Faire http://theradclyffe.blogspot.com/2010/11/sir-robert-sidney.html In case we don't, there's the link. As that was my first shot at Elizabethan menswear, some things didn't turn out quite as I'd have liked, and other things just didn't really survive the season. So I will be remaking some of this outfit, namely the doublet and slops.
The cape and sleeves, as pictured below, will be retained.
New fabrics and trim have been bought for the doublet and slops to match the existing color scheme, but create a completely new look:
Materials came from a number of different stores, including Loomcraft in Vernon Hills, Il, Vogue fabrics in Evanston, Il, Fishman's Fabrics in Chicago, Il, and Gayfeather Fabrics in Madison, WI.
I've been able to make a start and some good progress on the slops already. The slops are cut out and wefted (the material was just a tad too lightweight) and ready to be assembled. And excitingly, the better part of the night was spent cutting and constructing the panes, which are now finished!
Here you can see how I first flatlined the layers together, then used the copper Burmese Silk Blend to bind the edges, then couched a blue rattail in the ditch to give them that extra pop!
A couple panes together:
Laid out over the slops fabric:
And a close up of the finished panes fanning out on the slops fabric:
If I get called off of work tomorrow thanks to the Snomageddon, I'll continue putting the slops together tomorrow. Otherwise I'll get back to them sometime soon. Until then, enjoy these photos and your SnowDay if you are so lucky, and thanks for checking in!
Tuesday, January 25, 2011
Oxford Complete!
Huzzah!!! The first project to be started since making this blog is now finished! With the completion of the sleeves and a hat I now have a full ensemble for the Earl of Oxford. Since I've talked through most of the details in previous posts there's really not much left to be said. The "Look" isn't quite complete because I don't have my wig or facial hair arrangements yet but here are some photos of me in the suit as is:
"I'm a real boy!"
Overcompensation in the realest sense
So There we have it! Soooo excited to have completed it, and on deadline too!
Next up will be new doublet and slops for my brother who plays Sir Robert Sidney. Fabrics and beginnings soon to follow!
Thanks for making the journey with me and all your comments and support!
"I'm a real boy!"
Overcompensation in the realest sense
So There we have it! Soooo excited to have completed it, and on deadline too!
Next up will be new doublet and slops for my brother who plays Sir Robert Sidney. Fabrics and beginnings soon to follow!
Thanks for making the journey with me and all your comments and support!
Thursday, January 20, 2011
Happy New Year
I also received a handy dandy fantastic new camera!! I had been borrowing my mom's and now I have my own! It's a Nikon Coolpix, so I'm pretty much Ashton Kutcher now. Ok, luckily not. Anyhow.
So this evening and last I've made progress getting Oxford closer to completion. With the Bristol preseason starting to commence I've got many projects on my plate so I've given myself a deadline of this Saturday to complete Oxford. There's not too much yet to be done so I'm pretty sure this is reasonable. I've pinned and started to slip stitch the cape lining hem. One good movie and I'll be done with that. Tonight I patterned, cut, trimmed, and bejeweled two sleeves. I proceeded to construct, line, and finish one sleeve.
So I feel fairly good about getting everything done. I have most of friday to work as well as tomorrow evening. I need to throw together the second sleeve, finish hemming the cape, and maybe figure out some sort of headwear (although I still don't have a wig yet so maybe I'll hold off still). If everything goes according to plan I should be able to have some finished project shots up here by Saturday night. Fingers crossed!!!
Well thanks for checking back in! As always, I'd love to hear what y'all think!
Tuesday, December 21, 2010
Oxford update: Solstice Edition
So with a full evening and day off I managed to get some more work in before Christmas after all.
I managed to find all the buttons I needed, then after several times wresting them into the buttonholes and tearing up my fingers and nails with the uneven edges (and having one of them break off at the shank) I decided I couldn't stand those buttons and went out to seek more. So I put half of the new ones on and will pick up the other half tomorrow between a split shift at work.
Other than that I finished trimming the cape, added the filigrees, made a collar, turned out the cape with the lining and attached the collar and ties. The only thing left is to hem the lining to the cape. Because I allowed a little ease in the lining so it wouldn't pull and interfere with the drape of the cape I didn't just bag out that edge with the rest. The idea will be to hang the cape on a form and pin the lining to the cape where it wants to hang and where it won't pull in weird directions once it's on me. Problem: I don't have a form yet. Hopeful solution: I asked for a form for Christmas and I will hopefully hopefully hopefully get it. Then I can proceed with hemming the cape and that will be completed.
With the exception of a few last closures the slops are also finished. And with the exception of the missing buttons the doublet is also done. Tonight I was able to put on all three (nearly)completed pieces and get a great preview of the finished product:
Annnd again, my man faces don't photograph well apparently. But nevermind that for now, supposedly I will be getting man-lessons from my brother later...
So that's where I am as we wrap up the solstice. Unfortunately it's the official start of winter, fortunately it means every day from here out will get progressively longer! Aside from the aforementioned finishing items the next step in completing the outfit will be the sleeves. I have to order some flat back crystals and rim settings to decorate the sleeves but I can start putting the trim down once I pattern and cut the pieces. I'm quite excited at the progress so far and was ecstatic to be able to get myself into the gear tonight. Corset and all even after a big meal! Movement is great. I can sit, gingerly but mostly without fear. Kneeling, kicking, dancing, bending over a reasonable amount; all good. I can't imagine having junk though... I don't know where it would go. The slops are quite personal if you know what I mean. Everything is perfectly fit that way and I don't even need to make lacing holes and ties to tie the doublet to the slops. It all just stays put.
Anyway enough blathering on. Next update will probably be showing off any and all the goodies I get for Christmas. Should be a good haul considering the majority of my list was comprised of sewing or costuming tools. Super crossing my fingers for Gingher pinking shears and that dress form! Thanks for tuning in and Happy Solstice, Merry Christmas, and/or Happy Holidays!
I managed to find all the buttons I needed, then after several times wresting them into the buttonholes and tearing up my fingers and nails with the uneven edges (and having one of them break off at the shank) I decided I couldn't stand those buttons and went out to seek more. So I put half of the new ones on and will pick up the other half tomorrow between a split shift at work.
Other than that I finished trimming the cape, added the filigrees, made a collar, turned out the cape with the lining and attached the collar and ties. The only thing left is to hem the lining to the cape. Because I allowed a little ease in the lining so it wouldn't pull and interfere with the drape of the cape I didn't just bag out that edge with the rest. The idea will be to hang the cape on a form and pin the lining to the cape where it wants to hang and where it won't pull in weird directions once it's on me. Problem: I don't have a form yet. Hopeful solution: I asked for a form for Christmas and I will hopefully hopefully hopefully get it. Then I can proceed with hemming the cape and that will be completed.
With the exception of a few last closures the slops are also finished. And with the exception of the missing buttons the doublet is also done. Tonight I was able to put on all three (nearly)completed pieces and get a great preview of the finished product:
Annnd again, my man faces don't photograph well apparently. But nevermind that for now, supposedly I will be getting man-lessons from my brother later...
So that's where I am as we wrap up the solstice. Unfortunately it's the official start of winter, fortunately it means every day from here out will get progressively longer! Aside from the aforementioned finishing items the next step in completing the outfit will be the sleeves. I have to order some flat back crystals and rim settings to decorate the sleeves but I can start putting the trim down once I pattern and cut the pieces. I'm quite excited at the progress so far and was ecstatic to be able to get myself into the gear tonight. Corset and all even after a big meal! Movement is great. I can sit, gingerly but mostly without fear. Kneeling, kicking, dancing, bending over a reasonable amount; all good. I can't imagine having junk though... I don't know where it would go. The slops are quite personal if you know what I mean. Everything is perfectly fit that way and I don't even need to make lacing holes and ties to tie the doublet to the slops. It all just stays put.
Anyway enough blathering on. Next update will probably be showing off any and all the goodies I get for Christmas. Should be a good haul considering the majority of my list was comprised of sewing or costuming tools. Super crossing my fingers for Gingher pinking shears and that dress form! Thanks for tuning in and Happy Solstice, Merry Christmas, and/or Happy Holidays!
Wednesday, December 15, 2010
Collar, Cape and more!
Quite a bit more done!
With the exception of several more buttons to buy (have to hit all the Joann's in a 100 mile radius to find them all...) and sew on, the doublet is done. Did a fun chevron job on the collar and bound the armholes.
Moving on next to the cape... I picked up the velvet and a couple more trims for it and got all the trim down tonight.
The cape is a little over 180 degrees. 240 to be exact, with layered trim radials and cord fringe along the bottom edge. At the end of each radial there will be some sort of filigree or rosette... we'll see what I can find...
Well I can't believe Christmas is next week already! Not sure when I'll get to working on it more before then but we'll see what we can manage... So excited for how it's looking so far!
With the exception of several more buttons to buy (have to hit all the Joann's in a 100 mile radius to find them all...) and sew on, the doublet is done. Did a fun chevron job on the collar and bound the armholes.
Moving on next to the cape... I picked up the velvet and a couple more trims for it and got all the trim down tonight.
The cape is a little over 180 degrees. 240 to be exact, with layered trim radials and cord fringe along the bottom edge. At the end of each radial there will be some sort of filigree or rosette... we'll see what I can find...
Well I can't believe Christmas is next week already! Not sure when I'll get to working on it more before then but we'll see what we can manage... So excited for how it's looking so far!
Subscribe to:
Posts (Atom)